Supermicro CSE-213LT-563LPB Instrukcja Użytkownika Strona 13

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 70
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 12
2-1
Chapter 2: System Safety
Chapter 2
System Safety
2-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in the order provided should enable you to have your chassis
setup and operational within a minimal amount of time. This quick set up assumes
that you are an experienced technician, familiar with common concepts and ter-
minology.
2-2 Warnings and Precautions
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, le a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold the chassis. It should be
situated in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic elds are generated.
You will also need it placed near at least one grounded power outlet. When con-
gured, the SC213 chassis includes a power supply which requires a grounded
outlet.
2-3 Preparing for Setup
The SC213 chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the systems into a rack. Please read
this manual in its entirety before beginning the rack installation procedure.
Przeglądanie stron 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 69 70

Komentarze do niniejszej Instrukcji

Brak uwag