Supermicro 2016Ti-HTRF Instrukcja Użytkownika Strona 71

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 106
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 70
Chapter 6: Advanced Chassis Setup
6-7
6-5 Node Installation/Removal
As with any server system, power must be removed from the serverboard when
upgrading or installing memory or processors. In the 2U Twin server, the server-
boards (nodes) are capable of being hot-swapped from the chassis, allowing one
to be powered down for servicing while the other continues operating.
Important! Removing a node from the server affects the air ow through-
out the system. For this reason, nodes should be removed, serviced and
replaced as quickly as possible. Also note that powering down a node will
power down all the hard drives that are logically associated with it.
!
Removing a System Node
Depress the power button on the control panel to power down the node.1.
There are two latches located below the handles at the rear of the node tray. 2.
Push both of these inward.
While pushing the latches inward, grasp both handles and pull the node from 3.
the chassis.
Perform any service needed to the node in a timely manner.4.
Reinstall the node by pushing it into its bay until rmly seated.5.
Przeglądanie stron 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 105 106

Komentarze do niniejszej Instrukcji

Brak uwag